Grading/paving preparation and light pole foundation installation will occur on eastbound (EB) Route 2 between the Exit 5B off-ramp (Sutton Avenue) and the Exit 5C off-ramp (Maple Street).
Nighttime Hours: 7:00pm-6:00am, Sunday-Thursday
Excavation will continue this week on EB Route 2 between the Exit 5B off-ramp (Sutton Avenue) and the Exit 5C off-ramp (Maple Street). Catch basin installation and drainage work across EB Route 2 is also scheduled for this week between the Sutton Avenue overpass and the Exit 5C off-ramp (Maple Street). Paving on EB Route 2 is scheduled to occur between the Ensign Street overpass and the Exit 5A on-ramp (High Street).