Weeks 5/21/23 to 6/3/23

May 22, 2023 By Jeff Scala

Day Shift

    • Construction of the Sutton Avenue WB bridge – concrete deck construction. Sutton Avenue under the bridge will be closed to traffic during daytime construction hours. Sutton Avenue will open to traffic at the end of every workday. See the detour.
    • Median Barrier – finishing surface of concrete closure pours
  • Night Shift
    • Concrete pavement repairs WB between Ensign Street and the Hockamum River Bridge – expect lane closures.
    • Drill concrete shafts for CCTV span poles – expect lane closures.
    • Drill concrete shafts for overhead sign supports – expect lane closures.
    • Pave median area between High Street and Sutton Avenue.
  • Sutton Avenue Daytime Detour – Starting the week of April 24, 2023, daytime closures of Sutton Avenue at the Rte. 2 bridge will be implemented when necessary for safety reasons during construction. The detour will be during daytime construction hours from 7am to 4pm. Sutton Avenue will be opened to traffic at the end of construction everyday.