Week of 3/12 – 3/25

March 13, 2023 By Jeff Scala

Day Shift:

  • Willow Street eastbound on ramp: Work in the area involves excavation and grading in the gore area, with heavy equipment and large trucks present.
  • Sutton Ave Bridge Location: Ongoing work at this location is to prepare the temporary bridge required for stage construction on Route 2
  • Route 2 over Main Street Bridge: Contractor will be working on the bridge supports with personnel and equipment adjacent to the local road.

Night Shift

  • No Work is planned.