Weeks of 4/22/23 to 5/6/23

April 26, 2023 By Jeff Scala

Day Shift

  • Install permanent precast concrete median barrier between High Street an Main Street bridges.
  • Demolition of the Sutton Avenue WB bridge. Sutton Avenue under the bridge will be closed to traffic during daytime construction hours. Sutton Ave. will open to traffic at the end of every workday. See the detour.
  • Construction of foundations for overhead sign supports WB – west of the Hockanum River Bridge. Expect a lane closure.
  • Construction of foundations for camera supports at various location.

Night Shift

  • Concrete pavement repairs EB between Willow Street and High Street – expect lane closures.
  • Pave EB between Willow Street and High Street – expect lane closures. Scheduled for 5/2.
  • Mill asphalt down to concrete pavement WB between Ensign Street and the Hockanum River bridge – expect lane closures. Scheduled for 4/30.