Author: Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday The following operations are scheduled for this week on eastbound (EB) Route 2 between Exit 5 (Riverside Drive) and Exit 5A (High Street): grading and preparation for roadway paving, light pole foundation and curb installation. Construction of the drainage outfall at Goodwin University will continue this week. Nighttime Hours: […]

September 27, 2021 By Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday Grading and preparation for paving will occur on east bound (EB) Route 2. Construction of drainage swales is scheduled on the westbound (WB) side of Route 2, across the street from Two Rivers Magnet School. The drainage outfall at Goodwin University is also under construction this week. Nighttime Hours: […]

September 27, 2021 By Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday The following operations are underway on westbound (WB) Route 2 between the Ensign Street overpass, moving west toward the Exit 5 WB onramp: light pole foundation installation, metal beam rail installation, and paving on Main Street near the Exit 5A WB onramp (under Route 2). Nighttime Hours: 7:00pm-6:00am, Sunday-Thursday […]

September 17, 2021 By Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday No construction will occur on Monday, September 6th. Daytime operations will resume on Tuesday, September 7th. Metal beam rail installation will continue on Route 2 from the Exit 5A westbound (WB) on-ramp to the Exit 5 WB on-ramp on Route 2. Tree clearing/grubbing and topsoil formation continues in various […]

August 31, 2021 By Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday The installation of light pole foundations, curb, and metal beam rail is underway on Route 2 from the Exit 5A westbound (WB) on-ramp to the Exit 5 WB on-ramp on Route 2. Tree clearing/grubbing and topsoil formation continues in various locations.  Nighttime Hours: 7:00pm–6:00am, Sunday-Thursday Electrical conduit installation continues […]

August 30, 2021 By Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday Curb and metal beam rail installation will occur west of the Sutton Avenue overpass. Tree clearing and grubbing continues near the Riverside Magnet School. Nighttime Hours: 7:00pm–6:00am, Sunday-Thursday Roadway excavation continues on Route 2 behind the barrier on the westbound right shoulder. Partial drainage crossings will also occur this […]

August 19, 2021 By Jeff Scala

https://ctroute2.com/wp-content/uploads/2022/07/2021-8-18-Town-Hall-Meeting-Presentation.pptx

August 16, 2021 By Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday Curb installation continues west of the Sutton Avenue overpass. Tree clearing and grubbing will occur near the Riverside Magnet School. Nighttime Hours: 7:00pm–6:00am, Sunday-Thursday Underground conduit installation continued on Route 2 across various on-ramps on the westbound side. Roadway excavation will occur on Route 2 behind the barrier on […]

August 15, 2021 By Jeff Scala

Work Schedule* Daytime Hours: 7:00am–3:30pm, Monday-Friday Excavation, roadway boxout, drainage work, metal beam rail installation, and Incident Management System (IMS) installation continues on the Route 2 westbound right shoulder between the Maple Street overpass and the High Street westbound on-ramp. Drainage swale establishment continues along Riverside Drive across from Goodwin University. Tree clearing and grubbing […]

August 6, 2021 By Jeff Scala